Plastic mills are generally used for the recovery of chemical and waste materials. We usually use a normal temperature mill, also known as mechanical crushing. How to protect the plastic mill? And what are the details of the plastic mill? Let's take a closer look at the small series below. The following is an introduction to "How to protect the plastic mill and the details of the plastic mill".

Maintenance of the machine is an extremely important and frequent task. It should be closely coordinated with extreme operations and maintenance. There should be full-time personnel to check the duty.

Machine maintenance

1. The bearing bears the full load of the machine, so good lubrication has a great relationship with the bearing life. It directly affects the service life and working rate of the machine. Therefore, it is necessary to clean the injected lubricant, and it is necessary to seal well. The main oil filling part of the machine (1) rolling bearing (2) roll bearing (3) all gears (4) movable bearing, sliding plane.

2. It is necessary to check the installed tires for loosening.

3. Pay attention to whether the work of all parts of the machine is normal.

4, pay attention to the wear level of the wear parts, pay attention to replace the worn parts.

5. Place the bottom plane of the movable device, and the dust should be removed to prevent the movable bearing from moving on the chassis when the machine encounters unbreakable materials, resulting in serious accidents.

6, the bearing oil temperature rises, should be immediately parked to see the reasons to eliminate. It is necessary to open the water source switch before starting the water-cooled housing.

7. If there is impact sound when the rolling gear is working, it should be parked immediately to view and eliminate

Machine maintenance

1. The equipment should be installed on a level concrete foundation and fixed with anchor bolts.

The new plastic mill is equipped with a shock absorber anti-vibration horn for the machine, so it is not required.

2. Pay attention to the straightness of the main body and the horizontal when installing.

3. After installation, check if the bolts in all parts are loose and the main door is tight. If necessary, tighten them.

4. Configure the power cord and control switch according to the power of the device, pay attention to the rolling direction of the motor.

5, the end of the review, the empty load test, the test can be normal production.