Zhangjiagang Leyu Yiyi Machinery Factory
Service Hotline:18706246515
Banner
Home > news > Content

What should be paid attention to when using the mill?

Edit:Zhangjiagang Leyu Yiyi Machinery FactoryUpDate:2017-04-12

Mills should not be unfamiliar, and many industries use destructive processes when they are engaged in production activities. Mills can be divided into many types depending on the object of destruction. Today, I will come to talk to us about the topic of plastic mill. What should be paid attention to when using the plastic mill? Below we will learn more about the "Precautions for the use of plastic mills and the advantages of the equipment".

1. The plastic mill and power unit should be installed firmly. If the plastic crusher is to work for a long time, it should be fixed on the basis of the cement; if the plastic mill is required to move, the unit should be installed on the mobile base made of angle iron, and the power machine (diesel) Or the motor) and the pulley groove of the plastic breaker are in the same plane of rotation.

2. After the plastic mill is installed, it must be confirmed that the fasteners of each part must be tightened. Also check to see if the belt tightness is moderate.

3. Before starting the plastic mill, first move the rock to move the rotor to see if the teeth, hammer and rotor work sensitively. The crushing chamber controls whether the rotation direction of the rotor is consistent with the direction indicated by the arrow. The power machine and Whether the plastic crusher is well lubricated.

4. Do not replace the pulleys casually, in case the rotation speed is too high, causing the explosion chamber to explode, or the rotation speed is too low, which affects the working efficiency of the plastic mill.

5. After the plastic mill is started, it should be idling for 2~3min, and then no work will be carried out.

6. Pay attention to the working condition of the plastic mill at any time during the work. First, the feeding should be uniform to prevent the debris chamber from being blocked. Secondly, do not overload the machine for a long time. If vibration, noise, high temperature of the bearing and the body, and external spraying are found, stop immediately.

Address:Zhangjiagang Leyu Development Zone  TelePhone:18706246515  MobilePhone:18706246515  E-mail:1360565135@qq.com

Mobile